From:                              route@monster.com

Sent:                               Thursday, April 07, 2016 11:55 AM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: p6 Scheduler

 

This resume has been forwarded to you at the request of Monster User xapeix03

Daniel Waters 

Last updated:  10/16/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


El Segundo, CA  90245
US

Mobile: 310-806-1198   
bizynutd@aim.com
Contact Preference:  Telephone

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Daniel Waters - I&E Planner/Scheduler

Resume Value: t94rc25akryi69kb   

  

 


·   Routine Planning & Scheduling

·   Refinery & Power Plant Maintenance

·   Start Ups/Troubleshooting

·   Read elementary & schematic diagrams

·   Commissioning/Decommissioning

·   Database Management

·   GE/Siemens Turbines, B&W Boilers


 

PROFESSIONAL ACCOMPLISHMENTS

 

As a Planner/Scheduler for a major electric utility, worked independently and with the team to develop Maintenance Plans & Schedules for routine equipment checks, normal maintenance as well as major refit outages.

 

As a Site Superintendent for a major electric utility, coordinated daily maintenance for all craft (I&C, electrical, mechanical, welding), as well as emergency repairs, all completed under budget, on time and with no injuries.

 

EMPLOYMENT EXPERIENCE

 

Planner/Scheduler, NRG Energy, Inc., El Segundo Power LLC, El Segundo, CA.; Long Beach, CA

Maintenance/Outage Planning and Scheduling activities at the El Segundo and Long Beach Generating Stations utilizing Maximo, SAP R/3, MS Project & P6 CMMS. Maintained two GE 335 megawatt gas fired boilers/steam turbines, Maintained and decommissioned two Westinghouse145 Megawatt Gas-Fired Boilers/steam turbines. Commissioned two Siemens STG6-5000F(3) Flex Plant 10 - Combined Cycle Gas Turbine plants (2008 - Present)

 

Contractor Supervisor(O&M Manager 2), Fluor, Inc., El Segundo Power LLC, El Segundo, CA.

Coordinated daily maintenance for all craft (I&C, electrical, mechanical, welding, turbine overhaul), as well as emergency repairs. Managed in-house & supplemental timesheets.  Trained & enforced safety policies, reported directly to NRG all data(2008 - 2009)

 

Maintenance Superintendent, Total Western, Inc., El Segundo Power LLC, El Segundo, CA.

Supervised 14-man maintenance crew performing mechanical and electrical preventative maintenance, routine maintenance and emergency repairs for two 335 MW GE steam turbines. Coordinated daily maintenance for all craft (I&C, electrical, mechanical, welding), as well as emergency repairs (2006 - 2008)

 

Lead Electrician, Total Western, Inc./Irwin Industries Inc., El Segundo Power LLC, El Segundo, CA.
Directed two shop maintenance electricians in daily tasks through Mainsaver work management systems. Electrical Maintenance on two 145 MW & two 335 MW GE steam turbines Gas-Fired Boiler plants; Troubleshooting control & power circuits, transformer oil sampling (DGA, Physical properties). Installation, testing & removal of 120VAC & DC up to 4160 VAC Equipment, limit setting on motor operated valves (Limitorque/EIM), battery rack maintenance. Troubleshooting & repairing Bailey Infi 90 DCS system (plant critical alarm and controls). Isolation disconnection & testing of 18 -200kV 3-phase transformers. Installation of outage temporary power, work order updates and maintaining shop equipment certification & repairs. (2000 - 2006)

 

 

EMPLOYMENT EXPERIENCE

 

Maintenance Electrician, Irwin Industries, Inc., Inglewood, CA.
Inglewood Oilfield/Gas plant. Troubleshooting power and control circuits for submersible, air-balanced and standard pumping units. Rebuilding starter panels, running conduit, temporary power, terminating transformers, lights. (1999 - 2004)

 

Metro Construction Electrician, RT Construction, Inc., Hollywood, CA.
Los Angeles Metro Rail. New construction, lighting/conduit install, wire pull, transformer installation (1998 - 1999)

 

Refinery Construction Electrician, 10+ years working for various Contractors in Los Angeles, CA. at multiple refineries (Exxon-Mobil, Texaco, Unocal, Arco, Powerine, Ultramar, Chevron, Tasco) electrical instrumentation new projects: clean fuels unit, coking unit emission controls, preventative maintenance, substation installations & turn-around support (1989 - 1998)
 

 

EDUCATIONAL BACKGROUND

 

High School Diploma - 1986

Certificate of Electrical Technology, Long Beach City College - 1997

 

ADDITIONAL TRAINING


 

Primavera P6 – Pittsburg, CA – 2014

TapRooT Investigation Training – El Segundo, CA – 2011 & 2013

SAP R/3 Work Management, Procurement & Inventory – Long Beach, CA – 2013-2014

Maintenance Planning & Scheduling Handbook Training - Doc Palmer - 2013

Siemens - STG6-5000F3 Flex Plant 10 – El Segundo, CA - 2012

Maximo v7.5 Work Order Management Training – El Segundo, CA – 2009 & 2010

MS Project Standard 2003 - El Segundo, CA – 2003 & 2004

Mainsaver 2.0 OJT - El Segundo, CA – 2000 & 2001

 

 

 

Daniel B. Waters

El Segundo, CA

310.806.1198 cell
bizynutd@aim.com

 

BACKGROUND SUMMARY

 

A Senior Planner/Scheduler with extensive experience in Boiler/Plant & Refinery Operations & Maintenance

 



Experience

BACK TO TOP

 

Job Title

Company

Experience

I&E Planner/Scheduler

NRG Operations

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Manager (Manager/Supervisor of Staff)

Date of Availability:

Within 2 weeks

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

None

US Military Service:

Citizenship:

US citizen

 

 

Target Job:

Target Job Title:

I&E Planner/Scheduler

Desired Job Type:

Employee
Temporary/Contract/Project

Desired Status:

Full-Time

 

Target Company:

Company Size:

Industry:

Construction - Industrial Facilities and Infrastructure
Management Consulting Services

Occupation:

Building Construction/Skilled Trades

·         Electrician

Installation/Maintenance/Repair

·         Facilities Management/Maintenance

 

Target Locations:

Selected Locations:

US-CA-Los Angeles

Relocate:

Yes

Willingness to travel:

Up to 75% travel

 

Languages:

Languages

Proficiency Level

English

Fluent